• monitoring study on some coastal parts of sistan & baluchestan provinces and obtained experiences during these measurements

    جزئیات بیشتر مقاله
    • تاریخ ارائه: 1387/01/01
    • تاریخ انتشار در تی پی بین: 1387/01/01
    • تعداد بازدید: 776
    • تعداد پرسش و پاسخ ها: 0
    • شماره تماس دبیرخانه رویداد: -
     project of "monitoring and modeling on some coastal parts of sistan & baluchestan and bushehr provinces" is the first step of a national project, which has been undertaken by coasts and ports engineering dept. of ports and maritime organization. the prominent issues, which were considered as the most important project goals were measurements of marine parameters along with hydrodynamic and sediment researches within studied provinces in order to complete marinecoastal data and present strategies for resolving existing problems in the provinces. marin measurements in chabahar bay is considered as the first phase of the project which have been implemented in three studying areas. field measurements in nayband bay to dayer port and from dayer port to bushehr bay have been considered as the next two phases. in this article it is tried to study experiences gained from first phase of vast marine measurement regarding to anchoring system for equipment installation, equipment supervision, respecting safety tips and techniques for quality control of collected data in the studying area.

سوال خود را در مورد این مقاله مطرح نمایید :

با انتخاب دکمه ثبت پرسش، موافقت خود را با قوانین انتشار محتوا در وبسایت تی پی بین اعلام می کنم
مقالات جدیدترین ژورنال ها