همایش ، رویداد ، ژورنال
اینستاگرام تی پی بین
حوزه های تحت پوشش رویداد
  • optimal spares availability strategy for power transformer components

    نویسندگان :
    جزئیات بیشتر مقاله
    • تاریخ ارائه: 1392/07/24
    • تاریخ انتشار در تی پی بین: 1392/07/24
    • تعداد بازدید: 1244
    • تعداد پرسش و پاسخ ها: 0
    • شماره تماس دبیرخانه رویداد: -
    the paper suggests a method to optimize the spare amount of power transformer components. the proposed strategy is conceived to provide minimum annual cost consisting of expected failures renewalcost, capital cost for spares and load curtailment cost. the method identifies minor and major failures. minor failures are repairable, while major failures can be repairable or unrepairable. power transformer is a complex system, consisting of six components (functional parts). it is assumed that each component has two independent, competing failure modes: wear-out failure mode, modelled by two parameter weibull distribution, and a chance failure mode, characterized by an exponential distribution. the application of the method suggested and the benefits it provides are demonstrated for one transformer station (ts) 110/x kv/kv with 2×31.5mva transformers. in addition, the influence of performing power transformer refurbishment on expected total cost has also been analyzed.

سوال خود را در مورد این مقاله مطرح نمایید :

با انتخاب دکمه ثبت پرسش، موافقت خود را با قوانین انتشار محتوا در وبسایت تی پی بین اعلام می کنم
مقالات جدیدترین رویدادها
مقالات جدیدترین ژورنال ها