• bi objective optimization for scheduling two-stage assembly flow shop problem in a just in time environment

    جزئیات بیشتر مقاله
    • تاریخ ارائه: 1392/01/01
    • تاریخ انتشار در تی پی بین: 1392/01/01
    • تعداد بازدید: 906
    • تعداد پرسش و پاسخ ها: 0
    • شماره تماس دبیرخانه رویداد: -
     in this paper, we proposed a new bi-objective mathematical model for two stage assembly flow shop problem (tafsp) in just in time environment. assembly flow shop problem (afsp) is a special type of flexible job shop problem that has two stages. parallel and independent machines are exists in the first stage and only one machine (assembly machine) assembled jobs in the second stage. each job consisted of m+1 operation that process on m+1 machines in the two stage respectively. we applied method as exact approach to validate the proposed model and obtain fronts of the solutions in the solution space.

سوال خود را در مورد این مقاله مطرح نمایید :

با انتخاب دکمه ثبت پرسش، موافقت خود را با قوانین انتشار محتوا در وبسایت تی پی بین اعلام می کنم
مقالات جدیدترین رویدادها
مقالات جدیدترین ژورنال ها