• incorporating rework into construction schedule analysis

    جزئیات بیشتر مقاله
    • تاریخ ارائه: 1390/01/01
    • تاریخ انتشار در تی پی بین: 1390/01/01
    • تعداد بازدید: 695
    • تعداد پرسش و پاسخ ها: 0
    • شماره تماس دبیرخانه رویداد: -
     rework has been a primary cause of cost and schedule overruns in large construction projects. while several research efforts have analyzed the causes and effects of rework and provided guidelines to reduce rework, almost no research exists to analyze the impact of rework timing and quantity on schedule delays and to support decisions on cost effective recovery. this research presents a quantitative mechanism for schedule analysis considering rework. the mechanism has three aspects: (1) a new schedule representation of rework magnitude as negative percentage complete for affected activities, documented on the specific date on which the rework is detected; (2) a modified daily-windows delay analysis to apportion project delays among the responsible parties; and (3) an optimization technique for determining the least costly corrective action strategy that recovers project delays. the proposed approach is applied to a case study to demonstrate its ability to consider rework impact, in combination with other progress events by other project parties. this research offers an innovative quantitative approach to consider rework timing and amount in delay analysis and corrective action optimization.

سوال خود را در مورد این مقاله مطرح نمایید :

با انتخاب دکمه ثبت پرسش، موافقت خود را با قوانین انتشار محتوا در وبسایت تی پی بین اعلام می کنم
مقالات جدیدترین رویدادها
مقالات جدیدترین ژورنال ها