• the master production schedule of iranian babak copper company

    نویسندگان :
    جزئیات بیشتر مقاله
    • تاریخ ارائه: 1400/10/15
    • تاریخ انتشار در تی پی بین: 1400/12/23
    • تعداد بازدید: 198
    • تعداد پرسش و پاسخ ها: 0
    • شماره تماس دبیرخانه رویداد: 09050265032

    the master production schedule of iranian babak copper company

    production scheduling involves the allocation and prioritization of optimally performing the manufacturing tasks. clearly, minimizing the costs and increasing productivity matter the most to a production unit. therefore, it appears necessary to adjust the activities in the program aimed at minimizing the costs and increasing productivity. considering demand as a random variable brings the planning results closer to reality.

    seeing the amount of demand as a random variable makes the problem highly complicated. in industry, copper pipes are used in different sizes and shapes (coils, pancakes, and branches), and each of these types of products has a very different manufacturing time, and thereby, different costs.

    we tried in this article to provide a one-month production schedule for the copper pipe factory of the iranian babak copper company by presenting a linear programming model with the objective function and the necessary constraints with the help of the solver plugin in excel software. besides achieving the maximum profit, we expect the plan to meet the major needs of the market and operate compatibly with the capacity of the workstations. we also specified that which workstations should respectively add equipment to achieve a higher production capacity.

سوال خود را در مورد این مقاله مطرح نمایید :

با انتخاب دکمه ثبت پرسش، موافقت خود را با قوانین انتشار محتوا در وبسایت تی پی بین اعلام می کنم
مقالات جدیدترین رویدادها
مقالات جدیدترین ژورنال ها